DeMaria has been hired by DTE Energy to complete the Monroe Power Plant Fly Ash Basin Construction (MPPAB).
The construction of the 74 acre MPPAB includes: site preparation, soil erosion, and sediment control; excavation; general fill placement; overliner construction, consisting of a granular pore pressure relief layer, pore pressure relief piping system, and separation geotextile; perimieter berm construction; closure cover construction; storm water management features