Project Description

This project consisted of a new one-story psychiatric hospital facility to accommodate 40 beds (including acute care) with the possible future expansion to 80 beds. The building also includes food service/dining facilities, registration, administrative, clerical and alumni services. The new full service kitchen/dining facility serves the entire campus as well as select alumni functions in the main dining hall.

Highlights Include:

Continuous footings with brick and CMU foundation walls

Light-gauge metal wall framing and trusses

Horizontal siding and traditional windows

Sloped roofs with architectural shingles and some areas of low-sloped roofing

Sprinkler system

A variable air volume HVAC system with boiler(s) and an air-cooled chiller

Project Highlights

BUDGET: $8,000,000

MARKET: Health Care

OWNER: Diamond Healthcare

ENGINEER/ARCHITECT: Guernsey Tingle Archetects

Construction Management