St. Clair Plant Improvements, DTE Energy
Energy infrastructure improvements are a specialty of DeMaria. DTE Energy recently hired DeMaria to complete upgrades to their electric plant in St. Clair, MI. DeMaria's scope included a 6,400 sf floor deck replacement at the Elevating Conveyor and the construction of a new Battery Room and Logic Room within an existing facility.
|
|
Project Statistics: |
Cost: |
$579,000 |
Size: |
7,000 + sf |
Location: |
St. Clair, MI |
Type: |
Upgrades |
Engineer: |
DTE / CDA Engineering |
|
Delivery: |
General Contracting |
|
|
Project Highlights: |
Elevating Conveyor Replacement
|
Removal of old pre-cast floor panels |
20-gauge steel decking installed with poured slab-on-deck concrete |
Water containment diversions added |
Pumped in concrete (three separate pours) |
Abated steel for welding and added structural steel |
Battery / Logic Room
|
New masonry walls |
New slab-on-deck poured concrete |
Four new AC units installed |
Demolition of existing divider walls |
Relocation of existing door |
New mechanical louvers installed |
Fire dampers installed |
Epoxy coated floor |
Installation of floor angles |
|
|