Diagnostic Radiology Center, Crittenton Hospital
DeMaria recently finished a fit-out of existing space,
separate from the main hospital, to create a state-of-the-art outpatient
diagnostic radiology suite.
The design/build method and careful approach to costs
enabled the Hospital to realize significant savings without compromising
patient care or aesthetics. Quality-focused collaboration between
the architect and subcontractors enabled the project to be delivered
within the originally specified timeframe and budget. |
|
Project Statistics: |
Cost: |
$640,000 |
Size: |
7,000 sf |
Location: |
Rochester, MI |
Type: |
Tenant Build Out |
Architect: |
A3C |
|
Delivery: |
Design / Build |
|
|
Project Highlights: |
Lead shielded CT scanner room |
Steel support beams added to wooden structure |
Unistrut and thickened floor slabs created to support equipment |
Upgrades to mechanical and electrical systems |
Installation of new CT scanner |
Installation of fluoroscopic system |
Installation of mammography system |
Relocation of existing equipment from the main hospital |
Build out of new interior space |
Widened doors to allow equipment to pass through |
|
|